Coming soon

The Manufacturing
Playbook.

Make better decisions before you commit to a factory.

A practical guide for hardware founders, product leaders, and operations teams—from defining a product and choosing a manufacturing model to launching, supporting, and moving production. Drawn from Gary Bart’s experience developing products and working with manufacturers in China and across Asia.

Register your interest → Explore the chapters

The guide

12 parts, 50 chapters

The guide includes a start-here reading guide, chapter discussions, hypothetical teaching examples, a reader’s glossary, and a suggested development sequence covering 22 stages, 57 tasks, and four authorization gates.

The companion toolkit

31 useful toolkit items

The toolkit brings together resources T01–T31 with their purposes, formats, and chapter references. Formats include Excel workbooks, Word templates, and PDF references, with teaching examples and blank templates.

Inside the Playbook

From the manufacturing decision to the product’s next chapter.

First-time factory buyers can follow the “Before you send your first RFQ” reading path. Experienced teams can start with control, agreements, and intellectual property in Chapters 33–38, then turn to the decision in front of them.

Explore all 50 chapter titles
  1. Chapter 1 — The product brand’s role in manufacturing
  2. Chapter 2 — The five decisions that shape manufacturing strategy
  3. Chapter 3 — Define the product before choosing the factory
  4. Chapter 4 — The manufacturing strategy decision framework
  5. Chapter 5 — Contract manufacturing (CM)
  6. Chapter 6 — Original design manufacturing (ODM)
  7. Chapter 7 — Joint design manufacturing (JDM)
  8. Chapter 8 — Turnkey, consignment, and hybrid manufacturing models
  9. Chapter 9 — Choosing the right engagement model
  10. Chapter 10 — Manufacturing in the United States
  11. Chapter 11 — Manufacturing in China
  12. Chapter 12 — Manufacturing through Taiwan-based partners
  13. Chapter 13 — Manufacturing in Vietnam
  14. Chapter 14 — Manufacturing in India
  15. Chapter 15 — Selecting and approving the manufacturing location
  16. Chapter 16 — Product specifications and engineering deliverables
  17. Chapter 17 — When are you ready to engage a contract manufacturer?
  18. Chapter 18 — Prototypes, EVT, DVT, PVT, and manufacturing release
  19. Chapter 19 — Design for manufacturing and assembly (DFM/DFA)
  20. Chapter 20 — Tooling, fixtures, and production equipment
  21. Chapter 21 — Beyond the factory quote: total landed cost
  22. Chapter 22 — NRE, tooling, capital investment, and amortization
  23. Chapter 23 — Commercial negotiation and material commitments
  24. Chapter 24 — Pricing analysis: what the factory quote actually contains
  25. Chapter 25 — Conversion economics: charging structure, MVA, and fixed charges
  26. Chapter 26 — Payment, credit, and commercial closeout
  27. Chapter 27 — Finding and shortlisting manufacturers
  28. Chapter 28 — Manufacturing capabilities: electronics and non-electronic products
  29. Chapter 29 — RFIs, RFQs, and RFPs
  30. Chapter 30 — Factory audits and supplier qualification
  31. Chapter 31 — Working across cultures: communication, negotiation, and escalation
  32. Chapter 32 — Staffing in Asia, business travel, and the relationships behind manufacturing
  33. Chapter 33 — Who really controls your product?
  34. Chapter 34 — Manufacturing agreements: structure and commercial terms
  35. Chapter 35 — Quality remedies and defect allowances
  36. Chapter 36 — Brand and factory warranties
  37. Chapter 37 — Continuity, exit, and cross-border disputes
  38. Chapter 38 — Intellectual property, licensing, and tooling rights
  39. Chapter 39 — Production launch and ramp management
  40. Chapter 40 — Quality systems, inspection, and statistical sampling
  41. Chapter 41 — In-line, end-of-line, and independent OTB testing
  42. Chapter 42 — Firmware, OTA updates, and connected-product lifecycle management
  43. Chapter 43 — Regulatory compliance, certification, and cybersecurity
  44. Chapter 44 — Sustaining the product and the factory after launch
  45. Chapter 45 — Importing products into the United States
  46. Chapter 46 — Supply-chain resilience and risk management
  47. Chapter 47 — Scaling manufacturing and managing multiple factories
  48. Chapter 48 — Moving production or exiting a manufacturer
  49. Chapter 49 — Worked decision cases
  50. Chapter 50 — Making the final manufacturing decision

The toolkit · T01–T31

Working resources for the decisions that matter.

The set covers readiness and release gates; responsibility and control; country and supplier scorecards; RFI, RFQ, and RFP packages; factory audits; landed and lifecycle costs; tooling rights; agreement review; quality and firmware validation; factory transfers; Asia staffing and travel; and ongoing supplier issues.

Requirements templates include MRD, PRD, HRD, FRD, and QRD documents. Additional resources address component lead times, forecasts, reserve inventory, commitments, packaging, and transport qualification. Expand an item to see the purpose and intended format for each resource.

T01 — Manufacturing terminology glossary

Plain definitions of the terms used in this book, with conflicting usages and links between related terms.

Format: PDF

T02 — CM engagement readiness checklist

Decide whether you are ready to engage a contract manufacturer for a given stage, and what limited work can proceed while gaps close.

Format: Excel

T03 — Manufacturing release gate

Decide whether an exact configuration can be released for a build or shipment, on evidence, with controlled deviations. Includes prototype build tracking.

Format: Excel

T04 — Manufacturing Responsibility and Control Matrix

Record who performs, owns, approves, and is consulted on each manufacturing activity, with deputies, rights, and escalation.

Format: Excel

T05 — Country and production-configuration scorecard

Compare named factory and supply-route configurations across countries: gates first, then weighted scores with confidence shown.

Format: Excel

T06 — RFI, RFQ, and RFP templates

Send a consistent RFI, RFQ, or RFP package and compare bids line by line. Unpriced items show as unresolved, not zero.

Format: Word + Excel

T07 — Factory audit checklist and report

Record a factory audit: findings with evidence, financial review of the contracting entity, and a recommendation with limits.

Format: Word + Excel

T08 — Supplier qualification scorecard

Qualify suppliers on essential gates first, then on independent and consensus scores, with a reason for every change.

Format: Excel

T09 — Landed-cost, lifecycle-cost, NRE, and cash calculator

Compare sourcing options on landed cost, upfront investment, cash tied up in inventory, and payback.

Format: Excel

T10 — Tooling and asset ownership register

Track tools and production assets: physical ownership, design and operating rights, location, condition, trial evidence, and payments.

Format: Excel

T11 — Manufacturing control audit

Find out whether you can keep making, supporting, and moving the product: what you own, license, can access, and can transfer.

Format: Excel

T12 — Manufacturing agreement review and negotiation workbook

Run the agreement negotiation: mandate and limits, supplier-facing terms, concessions paired with returns, and the payment, freight, warranty, and dispute schedules.

Format: Word + Excel

T13 — Quality sampling and AQL plan

Run lot sampling only from complete, reviewer-approved plans, and record results, switching, and disposition.

Format: Excel

T14 — Independent third-party OTB testing protocol

Test the out-of-box experience on independently selected units across an explicit phone, app, and network matrix.

Format: Excel

T15 — Firmware and OTA validation matrix

Validate each firmware release against the hardware, app, and cloud combinations it will meet, including failure and recovery paths.

Format: Excel

T16 — Factory transfer readiness assessment

Decide whether a transfer to a named receiving site is ready, conditionally ready, or not ready.

Format: Excel

T17 — Factory transfer plan

Plan and run a factory transfer: tasks, dependencies, evidence, cutover gate, cash, and risks.

Format: Word + Excel

T18 — Supplier corrective-action register

Track supplier quality problems from containment through cause, correction, effectiveness, and closure, and catch repeats.

Format: Excel

T19 — Trade and regulatory reference sources

Official starting points for trade and regulatory questions, with what each source can and cannot support.

Format: PDF

T20 — Asia staffing decision matrix

Choose how to cover work near the factory: traveling staff, a consultant, an employee, an employer of record, or a local office.

Format: Excel

T21 — Factory visit preparation and closure checklist

Prepare a factory visit, record what you actually saw, and turn every commitment into a tracked action.

Format: Word + Excel

T22 — Supplier relationship and conflict-of-interest policy checklist

Checklist for a supplier-relationship and conflict-of-interest policy, including translators and interpreters.

Format: Word

T23 — Travel and technical meeting brief

Trip brief: itinerary, entry checks, device and data plan, technical agenda, and the decisions the traveler may make.

Format: Word

T24 — Cross-border issue and escalation register

Keep cross-language issues tied to the controlled original wording, with owners, deadlines, and proof of closure.

Format: Excel

T25 — Market Requirements Document (MRD) template

Write the market requirements, keeping evidence separate from hypotheses.

Format: Word + Excel

T26 — Product Requirements Document (PRD) template

Write the product requirements, each with a measurable criterion or a named owner for the gap.

Format: Word + Excel requirements/traceability register

T27 — Hardware Requirements Document (HRD) template

Write the hardware requirements as measurable limits, separate from drawings and part choices.

Format: Word + Excel requirement/verification register

T28 — Functional Requirements Document (FRD) template

Write the functional requirements as observable behavior, for normal and failure paths.

Format: Word + Excel behavior/verification matrix

T29 — Quality Requirements Document (QRD) and supporting quality-plan templates

Define the quality requirements and tie each one to a control, a test, and an approving authority.

Format: Word + Excel

T30 — Component lead-time, forecast, reserve inventory, and commitment register

Keep forecasts, reserves, purchase authorizations, and commitments separate, and see your maximum exposure.

Format: Excel + Word

T31 — Packaging and transport validation plan and qualification record

Plan and record packaging and transport qualification, and flag when changes or new channels need retesting.

Format: Word + Excel

Apply the thinking

Have a product or manufacturing decision to make?

Explore Gary’s consulting experience and discuss a potential scope. Engagements are considered individually, subject to conflicts and existing contractual obligations.

Explore consulting ↗

Be first to hear when it’s ready.

Register your interest in the guide, toolkit, or both for release updates.

Your information

Your email is required. Your role and interests are optional. Gary Bart stores your registration, consent, signup date, and source (such as LinkedIn or Substack) to manage interest in these resources. Your registration is separate from a Substack subscription.

To withdraw consent or request deletion, email gary@garybart.com. Your information is not sold. No payment information is collected.